I can understand how "discussions based upon real numbers rather than mysterious “Black Box” secrets" would be the very last thing that the Nuclear Energy Institute would like to engage in.
"The new study, Business Risks and Costs of New Nuclear Power, is one of the most detailed cost analyses publically available on the current generation of nuclear power plants being considered in this country. It is by a leading expert in power plant costs, Craig A. Severance. A practicing CPA, Severance is co-author of The Economics of Nuclear and Coal Power (Praeger 1976), and former Assistant to the Chairman and to Commerce Counsel, Iowa State Commerce."
In contrast to this transparency, many nuclear promoters have adopted a “Black Box” approach. It has unfortunately been the case over the last couple of years that some utilities have begun to claim that even rudimentary basics of their nuclear cost estimates must be hidden from the public as “trade secrets”. For instance, in the South Carolina Electric & Gas proposal to build two reactors now under consideration by the South Carolina PSC, there is literally a large “box” obscuring the bulk of the calculations in the SC E&G Exhibit which presents the utility’s projection of construction and financing costs for the proposed two-unit facility. In a different case, Duke Energy claimed that it does not even have to disclose its new cost estimates for a proposed nuclear facility in Cherokee County, S.C.. In the Duke case, C. Dukes Scott, South Carolina’s consumer advocate, who represents the public in utility rate cases, noted, “If the cost wasn’t confidential in February,” Scott said, “how is it confidential in April?”
Even when no effort to conceal information is apparent, the very terminology used when projections are presented can be confusing or misleading. For instance, in 2007 when a number of new nuclear proposals began to advance, it was common for “Overnight Cost” estimates to be quoted. For a project (such as solar or wind) whose construction period may be as short as several months, the difference between an “overnight” cost and the full cost to complete the project may not be significant. However, for a nuclear project that may typically take a decade to complete, cost escalations that occur during this long construction period, plus the financing costs during construction, may easily double the total cost of a project compared to its “overnight” cost. When the full picture is presented, some may perceive the total cost estimate has mysteriously doubled. However, it simply should have been stated clearly to begin with that major escalation and financing costs cannot be avoided when it takes a long time to complete a project. Failure to do so is tantamount to selling someone a house with “teaser” initial mortgage payments and failing to make clear that the mortgage payments will later reset to a much higher level.
Another mysterious “black box” presentation method is to fold the overall costs of the new facility into the general rate base of the utility, without ever mentioning what the generation costs per kWh of the nuclear unit will be. Instead, it is often only presented how total costs per kWh for all ratepayers will increase — which includes kWh’s generated by existing generation units. (For instance, if a nuclear unit is to supply 20% of the kWh’s for the utility when it comes on line, any cost increase per kWh appears to only be 1/5 as large because the additional costs are also spread over the 80% of kWh’s generated by other facilities, even though those other facilities did not cause the rate increase.) While it is important to know the impact on final overall retail electric rates, it is also important to know the generation costs per kWh from the nuclear facility. If this step is “skipped” in public presentations, the nuclear units (or any new generation power source that is more expensive than existing units) can appear far cheaper than their real impact.
The Paper takes the approach that it is best to lay out in detail “how you got that number” at each step of the way. All parties can then proceed to have discussions based upon real numbers rather than mysterious “Black Box” secrets.
I can understand how "discussions based upon real numbers rather than mysterious “Black Box” secrets" would be the very last thing that the Nuclear Energy Institute would like to engage in.