Welcome to DU! The truly grassroots left-of-center political community where regular people, not algorithms, drive the discussions and set the standards. Join the community: Create a free account Support DU (and get rid of ads!): Become a Star Member Latest Breaking News General Discussion The DU Lounge All Forums Issue Forums Culture Forums Alliance Forums Region Forums Support Forums Help & Search

xchrom

(108,903 posts)
Fri Dec 30, 2011, 11:41 AM Dec 2011

First Fast-Charging Station for E-Cars Goes Live as Part of ‘Electric Highway’

http://blogs.scientificamerican.com/observations/2011/12/29/first-fast-charging-station-for-e-cars-goes-live-as-part-of-west-coast-electric-highway/

2011 has turned out to be a groundbreaking year for electric vehicles—literally. The Washington State Department of Transportation (WSDOT) earlier this week chose a shopping center in Bellingham as the first location to break ground on the state’s segment of the West Coast Electric Highway, part of a 444-kilometer stretch of road along Interstate 5 between Washington’s borders with Oregon and Canada.

Bellingham will host the Electric Highway’s first direct-current (DC) electric vehicle fast-charging station, designed by AeroVironment Inc. to provide a 30-minute recharge for all-electric vehicles. (AeroVironment has deployed fast-charging stations in other locations nationwide, including Hawaii, as have competitors such as ECOtality Inc.) The Bellingham charging station will also include a pedestal with a 220-volt alternate-current (AC) outlet that can recharge one plug-in vehicle at a time at an intermediate rate of about two to eight hours, depending on the size of the battery. (Currently, some U.S. homes have 220-volt AC outlets installed to power air conditioners and clothes dryers. Most outlets supply 120-volt AC, which can charge e-cars at the slowest “trickle” rate.)

AeroVironment’s Electric Highway work with the WSDOT is part of the larger West Coast Green Highway, a three-state initiative to promote the use of cleaner fuels along nearly 2,173 kilometers of I-5 from British Columbia to Baja, California in Mexico. The U.S. Department of Energy is also adding fast-charging stations along I-5 through its EV Project, a nationwide initiative managed by ECOtality.

In terms of the Electric Highway, the WSDOT awarded AeroVironment a $1 million contract in July to outfit I-5 and U.S. Highway 2 with a network of at least nine fast-charging stations by November 30. The completion date slipped to next year as AeroVironment works out lease agreements for the charging locations.
Latest Discussions»Issue Forums»Environment & Energy»First Fast-Charging Stati...