Democratic Underground Latest Greatest Lobby Journals Search Options Help Login
Google

IAEA Briefing on Fukushima Nuclear Accident (2 April 2011, 12:00 UTC)

Printer-friendly format Printer-friendly format
Printer-friendly format Email this thread to a friend
Printer-friendly format Bookmark this thread
This topic is archived.
Home » Discuss » Topic Forums » Environment/Energy Donate to DU
 
OKIsItJustMe Donating Member (1000+ posts) Send PM | Profile | Ignore Sat Apr-02-11 10:49 PM
Original message
IAEA Briefing on Fukushima Nuclear Accident (2 April 2011, 12:00 UTC)
http://www.iaea.org/newscenter/news/tsunamiupdate01.html

Fukushima Nuclear Accident Update Log

Updates of 2 April 2011

Staff Report

IAEA Briefing on Fukushima Nuclear Accident (2 April 2011, 12:00 UTC)



Presentations:


Summary of Reactor Status, 2 April 2011, 12.00 UTC


On Saturday, 2 April 2011, the IAEA provided the following information on the current status of nuclear safety in Japan:

1.Current Situation

Overall at the Fukushima Daiichi plant, the situation remains very serious.

In preparation for transferring water in the basement of the Unit 1 turbine building to the condenser, water in the condenser storage tank is being transferred to surge tank of the suppression pool since 31 March 03:00 UTC. Water in the trench was transferred to a water tank at the central environmental facility main building. The water level in the trench was reduced by 1 metre to 1.14 metre below the top of the trench on 31 March. On Unit 2 in order to prepare for removal of the water from turbine building basement, pumping of water from the condenser to suppression pool water surge was started 29 March 07:45 UTC and was finished 1 April 02:50 UTC. On Unit 3 in order to prepare for removal of the water from turbine building basement, pumping of water from the condenser to suppression pool water surge was started 28 March 08:40 UTC and completed 30 March 23:37 UTC.

In a press release on the 2nd April NISA reported the following. Water with dose rate of greater than 1000 millisievert/hr was confirmed by TEPCO at around 00:30 UTC on 2nd April in a pit housing cables located next to the Unit 2 sea water inlet point. There exists a crack on the sidewall of the pit, about 20cm in length, and water inside the pit is confirmed to be leaking directly to the sea. The isotopic analysis of water samples from inside the pit, the sea and near the seawater inlet bar screen filter is in process. Currently a plan to patch the pit with concrete is underway to stop the leakage. An investigation on the leakage path to this pit is on-going and measures to stop leakage to the sea will be implemented.

Transfer of fresh water from a US Navy barge to the 'filtered water tank' started on 1 April 06:58 UTC, and was suspended on 1 April 07:25 UTC due to a connection failure. A second US Navy barge left Onahama port and planned to arrive 2 April 00:30 UTC.

On Unit 1 fresh water has been continuously injected into the reactor pressure vessel through the feed-water line at an indicated flow rate of 8 m3/h using a temporary electric pump with diesel backup. The indicated temperature at the feed water nozzle of the RPV has decreased from 256 °C to 249 °C and at the bottom of RPV decreased from 128 °C to 119 °C. There was a corresponding decrease in RPV pressure and Drywell pressure.

Fresh water is injected continuously through fire extinguisher line on Unit 2 at an indicated rate of 9 m3/h using a temporary electric pump with diesel backup. The indicated temperature at the feed water nozzle of the RPV has decreased from 165 °C to 161 °C. The temperature at the bottom of RPV was not reported. Indicated Drywell pressure remains at atmospheric pressure.

On Unit 3 Fresh water is being injected continuously at an indicated rate of 7 m3/h into the reactor core through the fire extinguisher line using a temporary electric pump with diesel backup. The indicated temperature at the feed water nozzle of the RPV is about 119 °C and at the bottom of RPV is about 90 °C.

Fresh water (90 T) was pumped into the spent fuel pool in Unit 1 using a concrete pumping truck on 31 March. In Unit 2, injection of water into spent fuel pond using the temporary pump was restarted on 1 April 05:56 UTC. Fresh water (180 T) was pumped into the spent fuel pool on Unit 4 using a concrete pumping truck on 1 April.

Units 5 and 6 remain in cold shutdown with plant systems operating on off-site AC power.

2. Radiation Monitoring

On 1 April, deposition of iodine-131 was detected in 7 prefectures ranging from 7 to 74 becquerel per square metre. Deposition of cesium-137 in 9 prefectures was reported on April 1st ranging from 2.9 to 76 becquerel per square metre. Reported gamma dose rates in the 45 prefectures showed no significant changes compared to yesterday.

The Ministry of Agriculture, Forestry and Fisheries of Japan informed the IAEA that, because of winter conditions, most cattle, pigs and chickens are presently kept indoors. Animals are primarily fed on stored dried grass, silage and grain that has not been contaminated by the releases from the Fukushima Daiichi NPP.

On 31 March, NISA reported that among the workers at the Fukushima Daiichi plant, 21workers have received doses exceeding 100 mSv. No worker has received a dose above 250 mSv, which is the dose limit for emergency workers.

On the 30 March, 180 000 Bq/l of I-131 and 15 000 Bq/l of Cs -137 were detected in the vicinity of the discharge water outlet of Unit 4.

The data reported for 27th - 30th March indicated that the levels at 30 m from the common discharge point of Units 5 and 6 were relatively constant at 45 000 - 55 000 Bq/l for I-131 and 10 000 - 15 000 Bq/l for Cs-137.

In addition to the 8 sampling points 30 km from the coast two additional monitoring stations were added in the South, 10km and 20 km from shore. The values reported for 28 and 30 March indicate a non-uniform distribution and trend.
Printer Friendly | Permalink |  | Top

Home » Discuss » Topic Forums » Environment/Energy Donate to DU

Powered by DCForum+ Version 1.1 Copyright 1997-2002 DCScripts.com
Software has been extensively modified by the DU administrators


Important Notices: By participating on this discussion board, visitors agree to abide by the rules outlined on our Rules page. Messages posted on the Democratic Underground Discussion Forums are the opinions of the individuals who post them, and do not necessarily represent the opinions of Democratic Underground, LLC.

Home  |  Discussion Forums  |  Journals |  Store  |  Donate

About DU  |  Contact Us  |  Privacy Policy

Got a message for Democratic Underground? Click here to send us a message.

© 2001 - 2011 Democratic Underground, LLC